An Eye on the Building Progress

An Eye on the Building Progress

Progress is visible now! For so long, it seemed there was little or no progress. It is impossible to miss now. Don Cook watched our builders before September’s Pep Club.

Our new lower level foyer is rough framed. Bathrooms are laid out. Door and window openings are clear to see.

 

Men’s bathroom on the left, Ladies on the right.

The new rear entrance, with stairwell framing visible on the left of the picture. There is also an emergency exit door in the new stairwell space.

Decking is being laid for our new welcome center space.

Walls will soon rise on this floor.

But the biggest, most dramatic change is that our existing side door is now closed permanently. Our old, very steep ramp is being torn out.

Can’t wait to see what is next.